MISSING
183
DESIGN - QUATTROBI TECHNICAL DEPARTMENT
Installing the channels
requires compliance with
min. dimensions.
The cut must not be less
than 220 mm wide, and
the false-ceiling bearing
supports must be close
enough to the structure
to allow better stability.
The false-ceiling must be
12.5 mm thick and
available height must be
430 mm or more.