477 VOL 2
Installation and Maintenance Process
Web Project Management Area
Events for professionals
Control System Implementation
Onsite App
Online Professional Tools
Support for our digital tools designed
for professionals.
Onsite App.
Web: Professional Area.
Technical Support Services (TSS)
Our technical service team is available to assist you
with any post-sales queries you may have, including:
Installation process.
Control System implementation process.
Maintenance.
Atmosphere Design Content
and Professional Training
Consult about Vibia’s training program.
Certification Programs: COMING SOON.
Certificate in Emotional Atmosphere
Design for project designers.
Certificate for Vibia Authorised Installers
to provide local support.
New Approach to Atmospheres Design:
Periodic online training sessions.
In-company training.
SPARE PARTS
Desconecte la red eléctrica.
1. Retire los tornillos internos del cuerpo.
2. Saque el asiento de la lampara.
3. Extrae la tapa con el portaLED
4. Retire los tornillos del LED.
5. Desconecte el LED de los cables de conexión.
6. Substituye el antiguo LED y manta térmica por los nuevos
bbsuministrados siguiendo los antiguos pasos a la inversa.
Switch off the mains and wait 60 seconds.
1. Remove internal screws.
2. Remove the seat.
3. Extract the top cover.
4. Remove the screws of the LED.
5. Discnnconect the LED from the wires.
6. Remove the old LED and heat sink. And install the new heat
bbblanket and LED following the previous steps bakcwards.
Exchanging the LED / Cambio de LED
1.
2.
4.
5.
3.
6.
6/8
Step 3/4
Electrical Connection
Connect luminaire / Conectar luminaria / Leuchte verbinden
Collegare l'apparecchio d'illuminazione / Connecter le luminaire
CAUTION
SHARP!