We have taken special care for the needs of
professionals involved in the installation process.
Tools, designed specificaly for Tracker allowed us
to simplify the installation work.
Simple
installation
Drywall builder
Electrical installer
1
Prepare primary ceiling construction
2
Hang LN, LR and UD luminarie housing
3
Bend UD side profile and click it onto housing
4
Line up electical cables
5
Mount secondary profiles and gypsum board
6
Insert multiple mounting tools
7
Fix the luminarie on plaster board
8
Apply plaster and clean the profile interior
9
Connect the power
Insert PCB chain
11
10
Cut the diffuser
12
Close the luminaire
WATCH THE VIDEOS
BACK TO INDEX