33
Installing in concrete ceilings
With projecting frame
Feeding through the corrugated
pipe, casting the cement and
removing the formwork
Fitting the body
into the housing
Spring anchoring
(15 mm high rim)
Fastening the outer
casing to the formwork
(using a closing cap)
1
2
3
4
100
15
12,5
100
Preparazione asola
per l'incasso
Fitting the body into the housing
Spring anchoring
(15 mm high rim)
Installing in plasterboard false ceilings
1
2
3
Installing in concrete ceilings
Flush with ceiling
1
2
3
4
5
Fastening
the adapter
Fastening the outer
casing to the formwork
(using a closing cap)
Feeding through the
corrugated pipe, casting
the cement and removing
the formwork
Fitting the body into
the housing
Spring anchoring
100
15
12,5
100
Preparing the slot and
inserting the frame
"Double face"
frame
Fitting the body into the housing
Spring anchoring
1
2
3
4
Installing in plasterboard false ceilings
New
OPTI
BEAM
Flush with ceiling
LED life ≥ 50.000 hours L80 B10 - Ta 25° C
IP65
IP65
products.iguzzini.com/laser_blade_inout