C 07 89
© Dennis Gilbert / VIEW
© Iwan Baan
© RubinowaDama / Shutterstock.com
Creative Commons
17
18
Art Gallery
Tate Modern
The Tate Modern
extension has been
carried out by the Swiss
architects Herzog & de
Meuron, who in 2000
also transformed the
old Bankside Power
Station into the main
venue of the museum.
La ampliación de la
Tate Modern ha sido
diseñada por los suizos
Herzog & De Meuron, que
ya fueron los encargados
de transformar en el año
2000 una antigua central
eléctrica en el edificio
principal de este museo.
Architecture
Student Centre LSE
London Zoo
Northern Aviary
Sporting Complex
Olympic Park
The 2012 Olympic Games
were planned to meet
sustainability goals, so
many facilities built for the
event were dismountable
and others reusable, like
the tower by Anish Kapoor
or the Olympic Stadium
by Populous.
Tucked into the dense
urban tissue of the
center of London, this
faceted volume of brick,
built by Irish architects
O’Donnell & Tuomey,
is the newest Student
Centre of the London
School of Economics.
Los Juegos Olímpicos 2012
se planificaron de forma
sostenible con muchas
de sus instalaciones
desmontables y otras
reutilizables como la torre
de Anish Kapoor y Cecil
Balmond o el Estadio
Olímpico de Populous.
Encajado en la trama
urbana del centro de
Londres, este volumen
facetado de ladrillo,
construido por los
irlandeses O’Donnell y
Tuomey, alberga el centro
de estudiantes de la London
School of Economics.
15
16
Basado en los principios
de la tensegridad, este
aviario fue concebido por
Price y Newby en 1961.
Based on tensegrity
principles, this aviary
was designed by Price
and Newby in 1961.